The Tide

'The Tide' is now open at Greenwich Peninsula, for client Knight Dragon.

Overview

The Tide is the highly anticipated linear park and elevated running track located alongside the riverfront at Greenwich Peninsula. On 5th July 2019, the first kilometre of this 5 kilometre-long elevated walkway was opened to the public. The Tide is one of the first phases of Knight Dragon’s masterplan for the regeneration of the Peninsula.

Maylim were contracted by Mace to complete the external works and landscape package. Design development included detailed paving layouts, granite cladding and seating drawings. As well as this, Maylim also produced the detailed design of statue plinth to accommodate 'The Mermaid', a sculpture by Damien Hirst.

Maylim’s remit included the full works package from basement to finishers; incorporating waterproofing, groundworks build ups and drainage. We also completed the groundworks and civils package off slab, to the north and south of the site. Large fair faced concrete retaining walls, up to 4 metres high and 3 metres wide, were installed with excavations up to 3 metres deep. These works were complex, with many excavations completed around live services. Our project team also carried out the design, supply and install of external works package which included vent grilles, retaining angles, edgings, bespoke slot drains.

The soft landscaping package features native trees, grasses and wildflowers across large landscaped mounds. Bespoke metal planters filled with shrubs and grasses are dotted around the paved spaces. Granite clad benches line the large riverfront step terrace where there are limestone paved terraces. There is also a generous granite paved central square, which has already been used for numerous festivals and events.

Details

Status

Complete / 5/07/2019

Client

Knight Dragon

Architect

Diller Scofidio + Renfro \ GROSS MAX

Main Contractor

Mace

Project Value

£4m