City North is residential development mixed use joint venture from Telford Homes and The Business Design Centre.
Overview
Across the scheme there are three communal landscaped roof gardens. The Pavilion is the largest of the three and spans over 2,000m2 providing a stunning outdoor space with views across the capital. The garden features metal planters, play equipment and seating areas. The project team installed composite decking, resin bound surfacing and artificial grass; offering a range of zones for residents to enjoy. The soft landscaping includes a wide variety of trees, ornamental shrubs, climbers, ferns and herbaceous planting.
Works at ground level were completed on a podium slab and included a large void former build up, drainage channels, and the installation of cells below ground for tree planting. Granite planters, steps and kerbs have been used throughout with a paving scheme featuring three different granite setts. The HVM strategy consisted of both automatic and static PAS bollards. 278 works consisted of carriageway resurfacing, new paving and kerbs.
Details
Status
Complete / 30/04/2021Client
Telford HomesArchitect
FabrikMain Contractor
Telford HomesEngineer
WalshProject Value
£2.4mGallery







Similar Projects
Projects / Complete

Projects / Complete

Projects / Complete
